THE CHALLENGE:
Builtech, LLC received 6 inches of rain in 7 days in late October.
With Winter nearing and the asphalt plants shutting down for the year
Builtech had to act fast to dry their site to keep their project delivery date on schedule.
THE SOLUTION:
They needed Soil Stabilization with Portland Cement to guarantee their project stayed on schedule.
Multiple lifts, totaling over 17,000 SYs treated with 445 tons of Portland Cement in 3 short days did the trick.
By drying and strengthening each lift to meet compaction, Builtech was able to place their asphalt by late November, avoiding costly delays.
We want to recognize Builtech, LLC for choosing to build smarter, build faster, & build better.